Three adobe-style desert homes with warm landscape lighting, surrounded by saguaro cacti and desert vegetation under a deep blue dusk sky.

Furnace Installation in Lovelock, NV

Tell us about the job

Takes about a minute. No obligation.

New system or replacementFurnace or heatingPershing County, NV
Step 1 of 2

What ZIP code is the job in?

80 percent AFUE is the floor here

Pershing County falls under zone 5B, where winter is the bigger load on a home's system. Any new non-weatherized gas furnace installed has to hit at least 80.0 percent AFUE, the minimum that's applied since November 2015.

That minimum is changing

Furnaces built on or after December 18, 2028 will have to reach 95.0 percent AFUE. If a replacement is coming up near that date, ask what AFUE rating the unit carries before it's installed, since the standard a furnace was built under stays with it.

8 months
October through May, your furnace is on duty
23°F
the average winter night it heats against
80% AFUE
the federal minimum any new unit must meet
Isometric grayscale illustration of a cutaway single-story house showing interior rooms with furniture, a furnace unit connected to ductwork and a tall vertical flue pipe extending above the roof.
Your furnace works hardest from November through April.

NOAA nClimDiv, 1991–2020 normals

Half the homes in Pershing County were built in 1984 or earlier, half in 1984 or later.

A standard furnace, sized to the house, fits either age fine.

Eight months of heat is a long time to run a furnace that's struggling

Heat runs October through May
Winter nights average 23°F
Climate zone 5B

Furnace here runs October through May. Overnight lows average 23°F through December, January and February, so those are the nights it works hardest. None of that calls for anything beyond a standard unit, sized to the house. A furnace this size, installed correctly, handles what this county's winters ask of it.

Meet the standard here

A new system here has to meet this region's minimum efficiency, which limits what can go in.

Find a contractor
A man in a cap, gray work shirt and dark pants, seen from behind, carries a worn canvas tool bag up porch steps toward a dark navy front door beside a potted shrub.
A gray high-efficiency gas furnace installed in an unfinished basement, surrounded by gas lines, a condensate drain, and sheet-metal ductwork.

The furnace is the smallest decision in the job

The unit itself is one piece of the job. Sizing it right takes a load calculation, not a guess based on the old furnace or square footage alone. Getting the ductwork to match matters just as much. If the trunk lines and returns were built for a different output, they may need adjustment, new transitions, or a plenum resized to move the air the new furnace produces. Venting changes the math too. A higher efficiency furnace condenses, which means it vents through PVC pipe instead of metal, and that pipe has to reach outside through a wall or roof, sometimes a longer run than the old vent had. Gas line and electrical hookups get checked against what the new furnace calls for, and if the old ones don't match, they get brought up to it. None of this shows up in the sticker price of the furnace, but all of it decides how the installed system performs once it's running.

Bigger isn't better

A furnace too large for the house cycles on, heats the air fast, and shuts off again before the house evens out. Those short cycles wear the ignition system and the blower harder than long, steady runs do, and the house ends up with warm and cold spots instead of even heat.

The load calculation looks at the house, not the old furnace

Sizing starts with the walls, windows, ceiling height, and how much of the house loses heat and where, room by room. A furnace matched to that number runs in longer, steadier cycles and holds a more even temperature than one sized off square footage or whatever was in there before.

Comparing quotes, ask what stage of heating each furnace uses, not just the AFUE number. A single-stage furnace fires at one output every time, full blast until the thermostat is satisfied. A staged or modulating furnace can run at a lower output most of the time and step up only when it's really cold, which means longer, gentler cycles and less temperature swing in the house. Ask what blower motor comes with it too. A variable-speed blower adjusts its airflow to match the furnace's output and tends to run quieter than a fixed-speed one. And ask about the warranty on the heat exchanger specifically, since that part is the most expensive to replace if it fails, and some manufacturers cover it much longer than they cover the rest of the unit.

Install day starts with the old furnace coming out, along with whatever venting and ductwork is being changed to fit the new one. If the vent category is changing, that PVC pipe gets run before the new furnace is even bolted into place, since the path to the outside wall or roof has to exist first. The furnace goes in, gets leveled, and gets connected to the plenum, the gas line, and the electrical. Every joint in the gas line gets tested for leaks before anything is fired up. Once it's hooked up, a tech runs it through a full cycle, checking the flame, the temperature rise across the heat exchanger, and the static pressure in the ductwork, and adjusts the gas valve or blower speed against the furnace's own specs rather than eyeballing it. The last step is a carbon monoxide test on the vent, not a glance, an actual reading, before anyone calls the job done.